TP 2 · Question sheet
Motor starters and a two-pump station
Group
Bench no.
Date
Members
Before the session
Answer each preparation question before the session: the answer or working, the value and its unit.
P1 Redraw the DOL control circuit of TD Exercise 2.2 as a ladder network, and mark which element of the hard-wired circuit each contact replaces.
ValueUnit
P2 Choose the timers: the star period is 5 s, and the open-transition gap between KM2 opening and KM3 closing is 60 ms. For each, give a timer number of the right resolution and its preset.
ValueUnit
P3 For the pumping station of Part C, draw the GRAFCET (or state table) of the pump selection logic.
ValueUnit
During the session
Answer at the bench, as you go.
D1 In Part A, press START while the overload contact F2_NC is open. What happens, and what does RESET change?
D2 In Part B, write the star duration and the open-transition gap that you measured. How far are they from 5 s and 60 ms?
D3 In Part C, after several minutes with changing demand, write each pump's number of starts and running time. Are the running hours shared?
D4 When SUPPLY is closed, which protection acts, after how long, and what brings the station back to normal?
At the end of the session
Answer when the tests are done, before the group signs the report.
Q1 In industry the star–delta interlock exists twice: once as a hard-wired auxiliary contact and once in the PLC program. Why is the software interlock alone not considered sufficient?
Q2 What is the purpose of the 60 ms gap? With reference to the simulated starting transients of Chapter 2, what happens in the motor when the delta contactor closes?
Q3 Why does lead–lag rotation extend the life of the pumps, and why does it not reduce the energy consumed?
Q4 The no-flow protection infers a fault from the absence of an expected change. Give two other examples of this technique in the mechanisms of the course.
Checkpoints
| DOL starter demonstrated with overload trip and reset. | Teacher's signature |
| Full star–delta sequence demonstrated; transition time measured. | Teacher's signature |
| Lead–lag alternation and lag-pump start demonstrated. | Teacher's signature |
Marking
| Preparation / 3 | Program / 6 | Bench / 6 | Report / 5 | Total / 20 |